Engine Removed
The G. Jezarian Racing’s Swift DB-4 will start the 2007 season with fresh Toyota power. BRM Motorsports in Long Island assisted in the engine removal and crating and shipping the power plant.
Upon it’s arrival to the engine builder, the entire unit will be disassembled and rebuilt to SCCA Pro Specifications. After reassembly, the motor will be fully broken-in and horsepower and torque will be recorded on a dyno.
The entire engine rebuild should be completed in 4 to 8 weeks.




